{"schemaVersion":"1.0","record":{"label":"Panda Game Manufacturing","description":"Custom tabletop-game manufacturing with component production, samples and assembly for larger runs.","aliases":["Panda GM"],"kind":"service","website":"https://pandagm.com/","overview":"Panda Game Manufacturing produces custom tabletop games with printed components, packaging and specialist pieces, including rubber playmats. It suits planned production runs rather than one-off merchandise: published minimums start at 1,500 games, with separate arrangements for freight and conditional component-only work.","license":"Commercial, quotation-based manufacturing service; freight is priced separately.","lifecycle":"unknown","example":false,"features":[],"alternatives":[],"slug":"panda-game-manufacturing","draftAlternatives":[{"targetSlug":"printninja","status":"limited","detail":"Panda requires at least 1500 games, or 2000 with custom plastics; component-only acceptance is conditional.","useCase":"Manufacturing custom tabletop games in production quantities","platforms":["Web service"],"region":"Unspecified","evidence":[{"url":"https://pandagm.com/components/","locator":"Cards, packaging, rubber playmats and custom pieces","retrievedAt":"2026-10-09T14:29:00Z","kind":"vendor"},{"url":"https://pandagm.com/docs/what-is-your-minimum-order-quantity-moq/","locator":"1500 units, or 2000 with custom plastics","retrievedAt":"2026-10-09T14:29:00Z","kind":"vendor"},{"url":"https://pandagm.com/docs/i-just-need-dice-can-you-quote-component-only-orders/","locator":"Conditional availability rather than a standard service","retrievedAt":"2026-10-09T14:29:00Z","kind":"vendor"},{"url":"https://printninja.com/printing-products/board-game-printing/","locator":"Component manufacturing and typical 500-unit minimum","retrievedAt":"2026-10-09T14:29:00Z","kind":"vendor"}]},{"targetSlug":"boardgamesmaker","status":"limited","detail":"Panda requires at least 1500 games, or 2000 with custom plastics; component-only acceptance is conditional.","useCase":"Manufacturing custom tabletop games in production quantities","platforms":["Web service"],"region":"Unspecified","evidence":[{"url":"https://pandagm.com/components/","locator":"Cards, packaging, rubber playmats and custom pieces","retrievedAt":"2026-10-09T14:29:00Z","kind":"vendor"},{"url":"https://pandagm.com/docs/what-is-your-minimum-order-quantity-moq/","locator":"1500 units, or 2000 with custom plastics","retrievedAt":"2026-10-09T14:29:00Z","kind":"vendor"},{"url":"https://pandagm.com/docs/i-just-need-dice-can-you-quote-component-only-orders/","locator":"Conditional availability rather than a standard service","retrievedAt":"2026-10-09T14:29:00Z","kind":"vendor"},{"url":"https://www.boardgamesmaker.com/","locator":"Custom game components and no-minimum ordering","retrievedAt":"2026-10-09T14:29:00Z","kind":"vendor"}]}],"evidence":[{"url":"https://pandagm.com/our-process/","locator":"Quotation, design verification, samples, assembly and separately priced shipping","retrievedAt":"2026-10-09T14:29:20.900Z","kind":"assessment"}],"document":{"version":1,"references":[{"url":"https://pandagm.com/our-process/","locator":"Quotation, design verification, samples, assembly and separately priced shipping","retrievedAt":"2026-10-09T14:29:00Z","id":"pa-process","title":"Panda manufacturing process","kind":"vendor"},{"url":"https://pandagm.com/components/","locator":"Cards, packaging, rubber playmats and custom pieces","retrievedAt":"2026-10-09T14:29:00Z","id":"pa-components","title":"Panda component options","kind":"vendor"},{"url":"https://pandagm.com/docs/what-is-your-minimum-order-quantity-moq/","locator":"1500 units, or 2000 with custom plastics","retrievedAt":"2026-10-09T14:29:00Z","id":"pa-min","title":"Panda minimum quantities","kind":"vendor"},{"url":"https://pandagm.com/docs/how-much-time-does-it-take-to-produce-my-game/","locator":"Stage estimates and extra miniature tooling time","retrievedAt":"2026-10-09T14:29:00Z","id":"pa-time","title":"Panda production timing","kind":"vendor"},{"url":"https://pandagm.com/docs/i-just-need-dice-can-you-quote-component-only-orders/","locator":"Conditional availability rather than a standard service","retrievedAt":"2026-10-09T14:29:00Z","id":"pa-only","title":"Panda component-only orders","kind":"vendor"},{"url":"https://pandagm.com/docs/can-you-make-prototypes-for-reviewers-and-content-creators/","locator":"Multiple-copy prototype suitability and advance file preparation","retrievedAt":"2026-10-09T14:29:00Z","id":"pa-proto","title":"Panda reviewer prototypes","kind":"vendor"},{"url":"https://pandagm.com/docs/can-you-work-with-print-files-that-are-not-created-in-adobe/","locator":"PDF output from other applications, including Affinity","retrievedAt":"2026-10-09T14:29:00Z","id":"pa-pdf","title":"Panda non-Adobe artwork","kind":"vendor"},{"url":"https://pandagm.com/docs/basic-five-what-are-the-basic-five-design-guidelines/","locator":"PDF, CMYK, resolution, bleed, margin and black text","retrievedAt":"2026-10-09T14:29:00Z","id":"pa-files","title":"Panda Basic Five file guidelines","kind":"vendor"},{"url":"https://pandagm.com/tools/","locator":"Guides, PDF template generator, dice layouts and specification sheets","retrievedAt":"2026-10-09T14:29:00Z","id":"pa-tools","title":"Panda tools and templates","kind":"vendor"},{"url":"https://www.boardgamesmaker.com/","locator":"Custom game components and no-minimum ordering","retrievedAt":"2026-10-09T14:29:00Z","id":"pa-bgm","title":"BoardGamesMaker services","kind":"vendor"},{"url":"https://printninja.com/printing-products/board-game-printing/","locator":"Component manufacturing and typical 500-unit minimum","retrievedAt":"2026-10-09T14:29:00Z","id":"pa-ninja","title":"PrintNinja board game production","kind":"vendor"}],"overviewCitations":["pa-components","pa-min","pa-only","pa-process"],"licenseCitations":["pa-process"],"sections":[{"id":"service","heading":"Manufacturing a complete tabletop game","paragraphs":[{"id":"scope","content":[{"text":"Panda Game Manufacturing works with game creators on production runs that combine printing, components, packaging and assembly. A project manager coordinates the work. Its staged approval process can be useful when a publisher needs to check how several manufactured parts fit together before committing the entire run to assembly."}],"citations":["pa-process"]},{"id":"range","content":[{"text":"The component range includes cards, folding boards, punchboards, wooden pieces, dice, plastic miniatures and custom boxes. Rubber playmats can have printing on either or both faces, special shapes and double-stitching. These options make playmats part of a broader game-manufacturing project; their presence does not establish a one-at-a-time retail playmat service."}],"citations":["pa-components"]},{"id":"minimum","content":[{"text":"The published minimum is 1,500 games, increasing to 2,000 for projects containing custom plastics. Component-only jobs are considered case by case and can depend on the time of year. A creator seeking only mats or dice should confirm acceptance before treating Panda as a replacement supplier."}],"citations":["pa-min","pa-only"]}]},{"id":"artwork","heading":"Files, templates and samples","paragraphs":[{"id":"pdf","content":[{"text":"Panda requires print-ready PDFs but does not require those PDFs to originate in Adobe software. Its guidance explicitly allows other applications, including Affinity, subject to prepress checks. This is useful for teams whose artwork workflow already uses different design tools."}],"citations":["pa-pdf"]},{"id":"specs","content":[{"text":"The Basic Five guidance calls for CMYK artwork, images of at least 300 ppi, 3 mm bleed, and at least 3 mm safety margin. Black text should use pure K black and overprint. Apply the correct component template as well; these general requirements are not a complete specification for every piece."}],"citations":["pa-files"]},{"id":"tools","content":[{"text":"The resource page provides a custom PDF template generator, standard InDesign templates, dice-face layouts and a specification sheet for non-paper components. Graphic-design, component and crowdfunding guides help a creator plan files and materials before requesting a final quotation."}],"citations":["pa-tools"]},{"id":"proof","content":[{"text":"After file verification and digital proofs, Panda produces a pre-production copy for review. A later mass-production copy is checked before final assembly. Reviewer prototypes are also possible, but Panda recommends them mainly for multiple copies and projects likely to proceed to its manufacturing service; files may be needed months ahead."}],"citations":["pa-process","pa-proto"]}]},{"id":"delivery","heading":"Plan for production and freight separately","paragraphs":[{"id":"time","content":[{"text":"Timing depends on the component list and file readiness. Panda gives an illustrative sequence of two to four weeks for design verification, two to three for pre-production, eight to ten for production, and two to three for assembly. Shipping can add four to eight weeks. Miniature sampling and tooling can add at least ten to twelve weeks. These are stage estimates, not a guaranteed delivery date."}],"citations":["pa-time"]},{"id":"freight","content":[{"text":"Shipping from the factory in China is separate from the manufacturing price. Customers can arrange collection through their own shipping agent or ask Panda for transport by ocean, air or land. Include destination, freight and delivery responsibilities in the quotation rather than comparing manufacturing unit prices alone."}],"citations":["pa-process"]}]},{"id":"substitutes","heading":"Comparing production-run services","paragraphs":[{"id":"compare","content":[{"text":"Panda can substitute for "},{"text":"PrintNinja","targetSlug":"printninja"},{"text":" for manufacturing boxed tabletop-game runs, and for "},{"text":"BoardGamesMaker","targetSlug":"boardgamesmaker"},{"text":" when a custom component project grows into a larger production run. PrintNinja describes a typical 500-game minimum, subject to components; BoardGamesMaker advertises no-minimum component ordering. Panda’s higher minimum and coordinated sampling suit a different production scale. Compare a shared bill of materials and delivery plan rather than assuming identical construction or pricing."}],"citations":["pa-process","pa-min","pa-ninja","pa-bgm"]}]}]},"id":"Q1512","revision":1614,"updatedAt":"2026-10-19T13:17:24Z","sourceUrl":"https://substitutefor.net/entities/Q1512?revision=1614"}}